Sultan Ismail Power Station TNB Generation Division, K’ Trengganu

Sultan Ismail Power Station TNB Generation Division, K’ Trengganu

Paka, Terengganu, Malaysia

The Sultan Ismail Power Station was completed in 1987 and officially opened in 1988 by Almarhum Sultan Mahmud Al-Muktafi Billah Shah of Terengganu.

It is the largest gas turbine power station in Malaysia, located in Paka, Terengganu approximately 100 km from the state capital, Kuala Terengganu. It generates 1,136 MW. This infrastructure is an oil and gas plant.

The station is the first and still remains the largest plant of this combined cycle type in Tenaga Nasional. With a capacity of 1150 MW, it is the second largest power plant after Port Klang Power Station. The station uses natural gas as the main fuel. The gas is supplied by Petronas from its nearby gas processing plant.

Sultan Ismail Power Station TNB Generation Division, K’ Trengganu